EAA Builders Log Website
EMail address:
Password:
- Lost my password
close
EAA Builders Log
(An EAA website).
Help
Contact Us
About
Sign Up
Login
Project:
S-21
- Entry
Date:
Jul 23, 2020
Hours:
2.0
Aileron cable (left) and wire grommets, flap cable
Category: Wings
Description:
Determined proper orientation of aileron cable and install, safety wire to bell crank. Drilled electrical wire grommet holes to size and install grommets. Installed telex cable for flaps and safety wired to anchor.
NOTE: This information is strictly used for the EAA Builders Log project within the
EAA organization
.
-
Policy
-
© Copyright 2024 Brevard Web Pro, Inc.